Project: Upgradation of Karachi Shipyard and Engineering Works (KS&EW), Project 313 (Package-III)

The project majorly constitutes of electrical works which includes but not limited to laying LT and HT cables, CCTV system, active and passive network, addressable firefighting system. In addition, it also has pipping system and manifold for 4 different gases (CO2, oxygen, acetylene and compressed air). The system for these gases is terminated in a small room which houses manifold, and is built on piles. All other systems are being terminated in containerized offices, designed and fabricated by our team. Two overhead cranes have been installed which were imported from ISIK Turkey and each crane was of 30 Tons capacity.