Project: Construction of Truck Loading Silo for Coal Handling System at SECMC Thar Block II, Pakistan
Year: 2020 – Ongoing
Location: Thar Block-II, Tharparkar, Sindh
Client/Consultant: SECMC
Main Project Features: Hoist Crane, Bag Filter, Transition Chute, Coal Belt Conveyor, Silicone section air cannon, Silo straight section air cannon, Hydraulic Flat Gate, Auto Lubrication System, Plow belt conveyor discharger, Silo Top Dust Filter, Construction of Silo through slip forming & Construction and erection of internal pre-casted structure
Activities Performed: Civil Foundation Works