Project: Construction of the Center for Advance Studies of Water at Mehran University of Engineering and Technology, Jamshoro.
It was funded by USAID. The building rests on 600mm 239 piles of 20 meters’ depth. It was lauded by USAID personnel as amongst the finest projects executed with their funding. It was installed with state of the art HVAC system and water was supplied with RO plants installed at the roof. To cater to the modern requirements of the university, an auditorium was built with seating capacity of 200 students, with sound dampening and anti-echoing walls and ceiling.